Study the bar-chart and pie-chart carefully to answer the given questions.

Working male and female population (in lakh) in various cities
Data interpretation set 1

DATA INTERPRETATION SET 2


      1) What is the difference between the number of working females in Bangalore and the number of working males in Chennai?
a) 12.5 lakh                 b) 11 lakh                                c) 9 lakh
d) 12 lakh                    e) 10 lakh

      2) In which city is the income per working person the minimum?
a) Delhi                        b) Jaipur                                  c) Bangalore
d) Chennai                   e) Mumbai

      3) What is the sum of the average working male and average working female population of the given six cities (calculate approximate value)?
a) 63.35 lakh               b) 49.96 lakh                           c) 51.48 lakh
d) 53.75 lakh               e) 65.51 lakh

4) In Delhi, what is the difference between the income of males and that of females? (Assume each person (male/female) has equal income.)
a) Rs.6.545 Crore        b) Rs.5.055 Crore                    c) Rs.2.935 Crore                  
d) Rs.3.455 Crore        e) Rs.4.565 Crore
                                               
      5) The number of working females in Mumbai is what percent of the number of working males in Bangalore?
a) 95%                         b) 110%                                   c) 120%
d) 132%                       e) 144%

Set 2

Study the given bar-chart carefully and answer the following questions.

                The graph shows the number of villages in fouir different states where electrification was done in different years.

DI SET 3

 6) The number of villages in Nagaland where electrification was done in 2013 is what percentage of the number of villages in Tripura where electrification was done in 2014?
a) 55.5%                      b) 44.4%                                  c) 77.7%
d) 66.6%                      e) 33.3%

       7) What is the ratio of the villages in Assam to those in Manipur where electrification was done in 2013?
a) 1 : 4                         b) 3 : 4                                     c) 1 : 2
d) 4 : 5                         e) 3 : 2

        8) In which state was the electrification work done in maximum villages during the given three years?
a) Assam                      b) Manipur                               c) Manipur and Tripura
d) Nagaland                 e) Manipur and Assam

        9) If the cost of electrification of a village is Rs.75 lakh then what is the cost of electrification in four states during the given period?
a) Rs.4319000000       b) Rs.3825000000                   c) Rs.4143000000
d) Rs.355700000         e) Rs.2721000000

       10)  In which year was the electrification work done in maximum number of villages?
a) 2012                         b) 2013                                    c) 2014
d) 2013 and 2012         e) 2012 and 2014

 Answers

1.      Option E

The difference between the working females in Bangalore and the working males in Chennai = 32.5 ⎯ 22.5 = 10 lakh

2.      Option B

Income per working person = Total income of city / Number of working people in city

Income per working person in Delhi = 200 Crore x 36/100  /  (30+25) Lakh = 72 / 55 = Rs.130.9
In Chennai = 200 x 16/100  /  (22.5+17.5) Lakh = Rs.80

In Mumbai = 200 x 20/100  /  (35+30) Lakh = Rs.61.53

In Kolkata = 200 x 14/100  /  (30+32.5) Lakh = Rs.44.8

In Bangalore = 200 x 10/100  /  (25+32.5) Lakh = Rs.34.78

In Jaipur = 200 x 4/100  /  (17.5+25) Lakh = Rs.18.82

The income per working person in Jaipur is the minimum.

3.      Option D

Average number of working males = 1/6 × (30 + 22.5 + 35 + 30 + 25 + 17.5) = 26.66 lakh
Average number of working females = 1/6 × (25 + 17.5 + 30 + 32.5 + 32.5 + 25) =27.08 lakh   
So, required sum = 26.66 + 27.08 = 53.75 lakh

4.      Option A
Total income of Delhi = [200 ×36/100] = Rs.72 Crore
Income per person = 72 Crore / 55 Lakh = Rs.130.9
So, required difference of income = 5 lakh × 130.9 = Rs.654.5 lakh
= Rs.6.545 Crore

5.      Option C

Required % = 30/25 × 100 = 120%

6.      Option E

Required % = 20/60 × 100 = 33.3% of electrification of villages in Tripura in the year 2014

7.      Option D

Number of villages in Assam where electrification was done in 2013 = 40
Number of villages in Manipur where electrification was done in 2013 = 50
So, required ratio = 4 : 5

8.      Option C

In Assam, the number of villages where electrification was done = 30 + 40 + 30 = 100
In Manipur = 40 + 50 + 60 = 150
In Tripura = 40 + 50 + 60 = 150
In Nagaland = 40 + 20 + 50 = 110
So, maximum electrification in both Tripura and Manipur.

9.      Option B

Total number of villages in four states where electrification was done = 100 + 150 + 150 + 110 = 510
So, cost of electrification = 7500000 × 510 = Rs.3825000000

10.  Option A

Number of villages where electrification was done in 2012 = 50 + 30 + 60 + 40 = 180
Number of villages where electrification was done in 2013 = 20 + 40 + 50 + 50 = 160
Number of villages where electrification was done in 2014 = 40 + 30 + 40 + 60 = 170
In 2012 maximum electrification work was done.
ebook store

About us

ramandeep singh

Ramandeep Singh is a seasoned educator and banking exam expert at BankExamsToday. With a passion for simplifying complex concepts, he has been instrumental in helping numerous aspirants achieve their banking career goals. His expertise and dedication make him a trusted guide in the journey to banking success.

  • Follow me:
Close Menu
Close Menu